Main menu
|
Adjustable throttle |
|
|
Types of work done:
- A new needle is being made
- New sleeves made
- A new hull is manufactured
- Chassis cover is made
- A new spindle is manufactured
- A new key is made
- A new pointer is produced
- Rubber O-rings and cuffs replaced
- Guiding ring is manufactured
- Made a stepped ring
- Flange End Cutting
- A groove was bored at the end of the flange according to the
standard
- Calibration of threaded connections of throttle parts
- The helm is manufactured
- Bearing replacement
|
|
|