Mixer reducer Print
  • After recovery:
Stirrer Reducer
  • Before restoration:
Stirrer Reducer
Types of work done:
  • Repair of the gear pump (new ones are made: axle, shaft, bronze bushings, body grinding done)
  • Making a new flange
  • Making a new gear
  • Restoration of the drive coupling half
  • Replacement of hydraulic hoses
  • Replacement of all bearings
  • Replacing rubber rings
  • Replacement of armored cuffs
  • Equipped with hardware
  • Manufactured: shaft washer, lock rings, spacers

  • A new pinion gear assembly is made (a new shaft, gear)
  • The driven shaft is manufactured
  • Making a Protective Saucer