Main menu
|
Swivel VB-100 |
|
|
Types of work done:
- A new trunk is made.
- A new mud tube was made.
- New crown nuts are manufactured.
- The mooring site for the fitting of the outlet to the mud pipe was made.
- Replaced bearings (thrust roller, radial-thrust ball, radial roller).
- Replaced cuffs (in the mud tube nuts, in the bottom lid).
- Rubber rings are replaced at the points of the mud pipe connector and the tap and the trunk.
- Gaskets replaced.
|
|
|