Rotor R-560 |
|
|
Types of work done:
- Disassembled, flushed and assembled rotor table.
- The rotor table bearing clearance is adjusted.
- The leading bevel gear and the intermediate gear set are manufactured.
- The restoration of the drive shaft.
- The clearance between the leading bevel gear and the intermediate gear set is adjusted.
- The bearing seats in the main shaft housing have been restored.
- The cover of the drive shaft housing was restored and the pressure flange was manufactured.
- A new star is produced.
- A new table cover is made.
- A new axis of the intermediate gear set is manufactured.
- The axle landing site in the rotor housing is bored.
- Replaced bearings.
- Rust cleaned and rotor table liner retainers in working condition.
- New knobs with stopper retainer for the rotor table drive shaft
- The body of the rotor is stripped from the welding influx.
- The bearings of the intermediate gear unit and the drive shaft have been replaced.
- Replaced cuffs.
- All gaskets have been replaced.
- The hatch cover is manufactured.
- The cap for the oil filling is made.
|
|
|